Operated Plant
7 March 2025
• Certification: Please let us know if you require copies of the operator’s certification before the start of the job. The relevant CPCS, NPORS, or equivalent certification will then be provided.
• Insurance Cover: Insurance cover for the unit may be required – please check with PAL, as this may depend on the length of hire.
• Delivery Timing: Plant may need to be delivered the day before the operator is due to work, to ensure that it is ready for the operator’s start time.